Construction waste treatment resources

Jun 19
09:08

2012

jodie mht

jodie mht

  • Share this article on Facebook
  • Share this article on Twitter
  • Share this article on Linkedin

In this process, the muck car loaded GPS positioning and monitoring will play a big role in the muck cars over 2400 vehicles

mediaimage

 It is understood that,Construction waste treatment resources Articles starting next month, the Kunming Urban Administrative and Law Enforcement Bureau and the District to view the construction site in districts that month, approved the month the delivery of construction waste disposal indicators, in principle, five Chinese, sun, vacation, High-tech Zone of the construction waste Unified transported to the processing base of the West Area; dragon, Guandu Economic Development, the Chenggong District transported to a processing base of the East Area. Construction waste sent to the two bases, two bases to issue five of the receipt, as a certificate delivered to the designated location. Municipal urban management and the end of each month on the district completion of assessment, reward and punishment or accountability based on evaluation results, and linked with the year-end appraisal.

    In this process, the muck car loaded GPS positioning and monitoring will play a big role in the muck car over 2400 vehicles in the city have already installed GPS positioning and monitoring of the approved districts will have the construction site of the construction waste, muck truck transport routes and other real-time tracking control, muck truck no construction waste delivered to the specified two processing bases, or elsewhere, dumping of construction waste, the monitoring system will alert the event.

    In addition, Kunming 14 mobile construction site bricks broken brick residue disposal equipment has been moved out on March 15 three-ring (tricyclic), because the mobile disposal equipment the city to use not only the surrounding environment will greatly pollution and noise, and is not conducive to supervise the construction site of the construction waste delivered to the designated place. In the future, the 14 movable disposal equipment will be two regular resources base cooperation can continue to use the ring outside.

    Urban management department also requires arrangements for staff 24 hours to accept construction waste sent two construction waste treatment resources base since yesterday, containing soil the amount of construction waste sent no more than 5% must be unconditionally free. Demolition site storage of construction waste removal and transportation in a timely manner to the designated location, will also be conducted in accordance with the relevant provisions of the 5000 to 50,000 yuan fine.

    Construction waste into construction waste and engineering spoil in accordance with the requirements of the project spoil to be transported to the field of consumer satisfied the specified consumptive, and construction waste will have to sent to treatment resources base for processing. Building waste smashed classified into five kinds of raw materials, the use of fixed equipment at the base, two of which can be regenerated made of bricks, made of three kinds can be recycled paving materials, maximize waste re-use resources.

The Pengda Min, general manager, talked about the future development of King Core R & D team to understand that road safety will be the trend of the times, are now actively integrated car electronics hyundai dvd player related needs, and thus put a wireless tire pressure sensor, head-up display, a small passenger cars, trucks, trip computer diagnostic communications, smart phones and cloud detection technology research and development, R & D has made great strides in the wireless tire pressure sensor, trip computer communications integration. The future direction of the company towards more vehicle electronic security parts of product development, will also lead the company towards the direction of listed!