Small Manufacturers Avoid Costly On-site Training in Material Resource Planning

Apr 2
07:44

2005

Rocky Smolin

Rocky Smolin

  • Share this article on Facebook
  • Share this article on Twitter
  • Share this article on Linkedin

Small manufacturers face the same challenges as larger manufacturers without the financial depth to resolve the same issues. The result has been that some of the technologies that allow mid-sized and larger manufacturers to achieve efficiencies have been out of reach for the smaller manufacturer until now.

mediaimage

Rocky Smolin,Small Manufacturers Avoid Costly On-site Training in Material Resource Planning Articles President of Beach Access Software and maker of E-Z-MRP. Smolin emphasizes that E-Z-MRP, “was designed to be used by people who do not have degrees or certification in manufacturing systems. It requires no on-site training or consultation. And it has cut the standard 18-month MRP implementation cycle to as little as 18 days”. The E-Z-MRP package includes a full-featured Bill of Materials processor, plus a material planning and tracking module which tracks all sales orders, forecasts, work orders (planned, firm, and released), purchase orders, shortages, raw materials and finished goods inventories. It also records a complete audit trail on all inventory transactions.

Also included is a physical inventory function, a purchase order module for printing purchase orders and a capacity planning module which reports work center loading and activity based on the user’s cost labor routings. Priced at $2995, the E-Z-MRP system is a fraction of the cost of systems with similar power and capabilities. It will run on any Windows-based PC or network, and requires only Access 2000 or Access XP to run. No on-site or remote training is required. A comprehensive user manual with tutorials provides all the required instruction.

For more information, and user testimonials, visit the company’s web site: http://www.e-z-mrp.com, or call 858-259-4334.