|
|
Structural Construction WorkConstruction work is very actual topic for many engineers and other related specialists. In this article I am going to overview main construction and assembly processes, process participants, management of construction work and general quality requirements.
Construction and assembly processes Construction and installation process is called the production process, which takes place directly on construction site and whose ultimate goal is to construct the production. Construction works are divided into: - Construction of new buildings - it's a new building or new construction of utilities and services Communications construction of the extension of an existing building construction, restoration of destructed cultural heritage values; - Construction works of operational buildings - is used for building maintenance, repair, reconstruction or demolition. Construction Process - the set of operations performed by the constant composition of workers in established technological coherence. Construction work is all the work carried out for construction or demolition of building. Construction works are divided: - General construction works: land of work (land relief management, building the foundation pit,, excavation, transport of their engineering networks construction of mining and filling, excavation digging, loading dikes communications services to build, canals and ditches, and their assertion of slopes claim excavation and filling works of agricultural drainage and irrigation systems to equipped, sea and inland water dredging, filling of dams and other similar profile land work); concrete, masonry, metal, wood and other building construction elements of installation and construction works, construction insulation, building internal and external decoration. - Special construction: mechanical works (buildings and external water supply, sewerage, Gas, heat production and supply of building heating and ventilation systems and other similar profile installation work); electrical works (power supply, transformation, distribution, lighting control, automation, telecommunication otherwise telecommunications, Protection of the fire alarms and other works of a similar profile). Construction process participants Producer (customer) Management of construction works General quality
requirements The output quality of construction products is formed in all
stages of construction: target-setting; design; construction and use. Quality
is influenced by both quantitative and qualitative factors. Quantitative
factors (cost, building expectancy, maintenance and repair costs, return, etc.)
can be accurately calculated and assessed. Qualitative factors (location of
infrastructure and environmental assessment, building credibility, comfort,
aesthetics, etc.) can be estimated indirectly - comparing one factor influence
another, on the basis of engineering method. Qualitative indicators measured
points as a percentage or ratio. Article Tags: Construction Work Source: Free Articles from ArticlesFactory.com
ABOUT THE AUTHORWeldLit - Metal Professionals Directory http://www.weldlit.eu
|
||||||||||||||||||||||||||||||||||||||||||
Partners
|